Brief Overview
The Off-Grid Battery System project at Baerami Creek was undertaken to provide a reliable, self-sufficient power solution for a rural property affected by an ageing and unreliable Ausgrid network. With frequent brownouts and limited supply capacity, the client made the decision to fully disconnect from the grid and transition to a standalone power system.
The project required a carefully engineered off-grid solution capable of delivering consistent power quality while supporting the property’s energy demands in all conditions.
As Jonny described it, “A great project to be a part of—the use of DC-coupled and AC-coupled solar makes this system extremely reliable.”
The project was successfully completed with a smooth changeover from grid power to off-grid power, eliminating brownouts and significantly improving overall power quality. The client reported increased reliability and capacity, with the system performing consistently across varying conditions